{"id":7228,"date":"2021-02-11T20:24:51","date_gmt":"2021-02-11T20:24:51","guid":{"rendered":"https:\/\/www.imegcorp.com\/?post_type=project&p=7228"},"modified":"2021-02-11T20:24:51","modified_gmt":"2021-02-11T20:24:51","slug":"plant-improvements","status":"publish","type":"project","link":"https:\/\/www.imegcorp.com\/project\/plant-improvements\/","title":{"rendered":"Plant Improvements"},"content":{"rendered":"
The wastewater stream from the local industry was high n hexavalent chromium. A new batch treatment system is required to provide more efficient removal to better meet downstream collection regulations. The new plant consists of a batch treatment process using parallel processes, one of electrocoagulation and the other of chemical coagulation Solids from the treatment process will be treated using a filter press and stored on-site in a batch tank until the solids can be hauled away.<\/p>\n
The scope also included the construction of a new office building. heating hot water distribution, steam, and condensate.<\/p>\n","protected":false},"excerpt":{"rendered":"
The wastewater stream from the local industry was high n hexavalent chromium. A new batch treatment system is required to provide more efficient removal to better meet downstream collection regulations. The new plant consists of a batch treatment process using parallel processes, one of electrocoagulation and the other of chemical coagulation Solids from the treatment<\/p>\n","protected":false},"featured_media":7229,"menu_order":0,"template":"","meta":{"_links_to":"","_links_to_target":""},"project_category":[142,208],"project_market":[138],"project_service":[28,62,13],"project_region":[187],"acf":[],"yoast_head":"\n