{"id":4986,"date":"2020-06-15T14:48:51","date_gmt":"2020-06-15T14:48:51","guid":{"rendered":"https:\/\/www.imegcorp.com\/?post_type=project&p=4986"},"modified":"2024-09-05T09:27:16","modified_gmt":"2024-09-05T14:27:16","slug":"master-plan-update","status":"publish","type":"project","link":"https:\/\/imegcorp.com\/project\/master-plan-update\/","title":{"rendered":"Master Plan Update"},"content":{"rendered":"

The project:\u00a0<\/strong>Develop a GIS database for master plans and provide a risk and resilience assessment.<\/p>\n

The goal:<\/strong>\u00a0The city of Pico Rivera needed to update their master plans for water, wastewater collection, and storm drain. They also wanted to update their Emergency Response Plan.<\/p>\n

Project approach:<\/strong>\u00a0To update the water master plan, IMEG updated the GIS system, developed a hydraulic model, and performed site inspections of the water treatment plants and pumps. The plan also evaluated the then-current population projection, water demand estimates, and water supply availability. The conclusion of the plan included an evaluation of the city\u2019s budget and the development of a CIP. IMEG also updated the wastewater collection and storm drain plans.<\/p>\n

IMEG\u2019s security services included assisting the city in updating their Emergency Response Plan with specific and outlined responses for a variety of situations to protect their staff and provide a safer and more secure work environment. A Risk and Resilience Assessment was completed, finding and addressing numerous gaps in their physical, material, IT, and employee security.<\/p>\n

Additional services included:<\/p>\n