{"id":2457,"date":"2019-08-21T20:35:22","date_gmt":"2019-08-21T20:35:22","guid":{"rendered":"http:\/\/www.imegcorp.com\/?post_type=project&p=2457"},"modified":"2024-02-01T11:09:58","modified_gmt":"2024-02-01T17:09:58","slug":"campus-wide-renovation-and-additions","status":"publish","type":"project","link":"https:\/\/www.imegcorp.com\/project\/campus-wide-renovation-and-additions\/","title":{"rendered":"Healthcare Center Campus-wide Renovation and Additions"},"content":{"rendered":"
LEED Certified to LEED Gold Certified<\/p>\n
The project:<\/strong> A $418 million renovation and campus beautification project added a Wellness & Aquatic Therapy Center, outpatient facilities, and expanded the inpatient areas to improve seismic safety.<\/p>\n The goal:<\/strong> Upgrade the campus with technologically advanced facilities and increase accessibility for patients and the surrounding community to secure Rancho Los Amigos\u2019 future as one of the top-ranked rehabilitation hospitals in the nation.<\/p>\n Project approach:<\/strong> Design and construction of the campus was completed via design-build and design-bid-build delivery methods and was done in two phases. IMEG provided engineering design services for Phase 1 and provided due diligence for Phase 2.<\/p>\n Project highlights:<\/strong> Phase 1 (completed via design-build delivery) included the demolition of multiple campus buildings, including two major facilities, and the construction of new buildings on the demolished site. New buildings included the LEED Gold, 13,000-sf Wellness & Aquatic Therapy Center; new campus entry plaza; LEED Silver, 12,000-sf warehouse; LEED Certified, 103,000-sf, three-story outpatient building; LEED Certified, 40,000-sf Jacqueline Perry Institute (JPI) addition and first-floor remodel; parking structure expansion; and re-routed utilities that were buried or placed adjacent to the Phase 1 area. Utility re-routing was completed while maintaining continuity of services for the campus.<\/p>\n Phase 2 involved the LEED Silver, 64,804-sf renovation of the historical Harriman Building; LEED Gold, 49,221-sf renovation of the Support Services building; Preparation of demolition drawings for site utilities of various buildings; and design of various utilities, such as space cooling, heating hot water distribution, steam, and condensate; domestic cold and hot water, recirculating line, medical and natural gas, and industrial air into campus tunnels; and electrical systems, including normal and emergency power. Additional campus improvements spanning the 42-acre site followed, along with the decommissioning and demolition of several OSHPD buildings.<\/p>\n