{"id":4416,"date":"2021-09-02T14:00:47","date_gmt":"2021-09-02T14:00:47","guid":{"rendered":"https:\/\/www.imegcorp.com\/?p=4416"},"modified":"2021-09-17T14:16:16","modified_gmt":"2021-09-17T14:16:16","slug":"design-silos-come-down-when-an-av-engineer-leads-an-av-project","status":"publish","type":"post","link":"https:\/\/imegcorp.com\/insights\/blog\/design-silos-come-down-when-an-av-engineer-leads-an-av-project\/","title":{"rendered":"Design silos come down when an AV engineer leads an AV project from the beginning"},"content":{"rendered":"

\"\"<\/p>\n

Note: The advanced AV design on the following project added full, high-quality audio and video remote conferencing, which has been utilized extensively during COVID-19. County commissioners, staff and the public can attend any meeting from a remote computer and be heard in the boardroom and on all other remote attendees\u2019 computers as well.\u00a0<\/em><\/p>\n


\n

By David Wright<\/span>\u00a0<\/span><\/p>\n

IMEG was recently involved in what I consider a benchmark project for the audio-visual industry \u2013 one that illustrates the benefits of not only having technology designers involved from the very beginning, but also having AV engineers with acoustic qualifications rise to the occasion and lead the design.\u00a0<\/span>\u00a0<\/span><\/p>\n

The project was a renovation of the historic art deco council chambers inside the San Diego County Administration Center. The 1980s-style boardroom offers stunning bayside views through large arched windows\u00a0<\/span>but had obscured the\u00a0<\/span>scene with<\/span>\u00a0heavy floor-to-ceiling drapes (the original thinking being that acoustics is defined by dead, dry absorption). AV gear was arbitrary, undersized, and without proper sightline for most viewers; a \u201cstudio style\u201d presentation was broadcast via analog cable to thousands of people from numerous municipal groups.\u00a0<\/span>\u00a0<\/span><\/p>\n

The renovation was, for all intents and purposes, a two-year AV project.<\/span>\u00a0<\/span>But while the design completely updated the space it also created two major acoustic and AV challenges:<\/span>\u00a0<\/span><\/p>\n