{"id":3399,"date":"2019-10-11T14:25:31","date_gmt":"2019-10-11T14:25:31","guid":{"rendered":"https:\/\/www.imegcorp.com\/?post_type=news_events&p=3399"},"modified":"2019-10-11T14:36:27","modified_gmt":"2019-10-11T14:36:27","slug":"new-englewood-stem-high-school-opens-for-freshman-class","status":"publish","type":"news_events","link":"https:\/\/www.imegcorp.com\/news_events\/new-englewood-stem-high-school-opens-for-freshman-class\/","title":{"rendered":"New Englewood STEM High School opens for freshman class"},"content":{"rendered":"
Chicago Public School\u2019s (CPS) new Englewood STEM High School recently opened for the freshman class of 2023. The 150,000-sf school includes multipurpose educational spaces, an outdoor sports facility, and a health clinic for students, staff, and the community. IMEG provided mechanical, electrical, technology, and architectural lighting design for the new facility \u2013 the South Side neighborhood\u2019s first new school since the 1970s.<\/p>\n