{"id":16285,"date":"2024-04-10T15:32:37","date_gmt":"2024-04-10T20:32:37","guid":{"rendered":"https:\/\/www.imegcorp.com\/?post_type=library&p=16285"},"modified":"2024-04-10T15:33:05","modified_gmt":"2024-04-10T20:33:05","slug":"wetlands-bridge-replacement","status":"publish","type":"library","link":"https:\/\/www.imegcorp.com\/library\/wetlands-bridge-replacement\/","title":{"rendered":"Wetlands Bridge Replacement"},"content":{"rendered":"

This two-minute video highlight’s IMEG’s use of a time-saving 360 camera while performing the hydrology and hydraulic survey of a deteriorating county bridge that was built in 1955. IMEG was hired by the Minnehaha County Highway Department in South Dakota to produce options to replace the bridge.<\/p>\n