{"id":15572,"date":"2023-05-16T15:30:15","date_gmt":"2023-05-16T20:30:15","guid":{"rendered":"https:\/\/www.imegcorp.com\/?post_type=library&p=15572"},"modified":"2023-11-17T08:36:34","modified_gmt":"2023-11-17T14:36:34","slug":"interstate-74-bridge-corridor","status":"publish","type":"library","link":"https:\/\/www.imegcorp.com\/library\/interstate-74-bridge-corridor\/","title":{"rendered":"Interstate 74 Bridge Corridor"},"content":{"rendered":"

This video featuring drone footage by IMEG\u2019s John Johnson shows the new Mississippi River bridge between Davenport, Iowa, and Moline, Ill. The bridge was the major component of the $1 billion Interstate 74 Bridge Corridor Project, completed in late 2021. IMEG provided construction observation, materials testing, verification and documentation, and bridge inspection services for several components of the project\u2014the firm\u2019s largest civil undertaking to date.<\/p>\n