1.0IMEGTaryn/insights/blog/author/taryn/william hill app Upgrades included replacingrich600338&william hill app;blockquote class="wp-embedded-content" data-secret="02lH99ntR9"&william hill app;a href="/project/data-center-renovation/"Data Center Renovation&william hill app;/a&william hill app;/blockquote&william hill app;iframe sandbox="allow-scripts" security="restricted" src="/project/data-center-renovation/embed/#?secret=02lH99ntR9" width="600" height="338" title="“Data Center Renovation” — IMEG" data-secret="02lH99ntR9" frameborder="0" marginwidth="0" marginheight="0" scrolling="no" class="wp-embedded-content"&william hill app;/iframe&william hill app;script type="text/javascript" /* &william hill app;![CDATA[ */ /*! This file is auto-generated */ !function(d,l){"use strict";l.querySelector&&d.addEventListener&&"undefined"!=typeof URL&&(d.wp=d.wp||{},d.wp.receiveEmbedMessage||(d.wp.receiveEmbedMessage=function(e){var t=e.data;if((t||t.secret||t.message||t.value)&&!/[^a-zA-Z0-9]/.test(t.secret)){for(var s,r,n,a=l.querySelectorAll('iframe[data-secret="'+t.secret+'"]'),o=l.querySelectorAll('blockquote[data-secret="'+t.secret+'"]'),c=new RegExp("^https?:$","i"),i=0;i&william hill app;o.length;i++)o[i].style.display="none";for(i=0;i&william hill app;a.length;i++)s=a[i],e.source===s.contentWindow&&(s.removeAttribute("style"),"height"===t.message?(1e3&william hill app;(r=parseInt(t.value,10))?r=1e3:~~r&william hill app;200&&(r=200),s.height=r):"link"===t.message&&(r=new URL(s.getAttribute("src")),n=new URL(t.value),c.test(n.protocol))&&n.host===r.host&&l.activeElement===s&&(d.top.location.href=t.value))}},d.addEventListener("message",d.wp.receiveEmbedMessage,!1),l.addEventListener("DOMContentLoaded",function(){for(var e,t,s=l.querySelectorAll("iframe.wp-embedded-content"),r=0;r&william hill app;s.length;r++)(t=(e=s[r]).getAttribute("data-secret"))||(t=Math.random().toString(36).substring(2,12),e.src+="#?secret="+t,e.setAttribute("data-secret",t)),e.contentWindow.postMessage({message:"ready",secret:t},"*")},!1)))}(window,document); /* ]] */ &william hill app;/script /wp-content/uploads/2022/02/Data-Mission-2.jpg1130670This client needed to upgrade their existing data center chiller plant and chilled water distribution system in order to meet the planned growth of their data center while reducing energy and water usage. IMEG was challenged to provide environmentally “friendly” design for the data center as well as keep it operational. Upgrades included replacing the